Runway Change Guide

Runway changes can improve aerodrome efficiency but require careful coordination to ensure a smooth transition. The Tower controller is responsible for initiating a runway change, ensuring all affected units are informed, and managing the transition effectively. This guide outlines the procedures for a safe and efficient runway change.

Conditions for Runway Changes

A runway change may be necessary due to various factors, including but not limited to:

  1. Weather Conditions:

    • Significant wind shifts affecting operations.
    • Consecutive missed approaches.
    • Low Visibility Procedures (LVPs).
  2. Operational Considerations:

    • Runway equipment availability (e.g., ILS operational status).
    • Optimised arrival sequencing for increased efficiency.

Initiating a Runway Change

When a runway change is deemed necessary, the Tower controller must coordinate the following with all relevant ATC units:

  1. Estimated time of runway change completion.
  2. Identification of the last departure using the current runway.
  3. Identification of the last arrival using the current runway

Tower declares the last arrival, but this must be confirmed by Approach (APP), as APP has the final say on arrivals.

The last departure and last arrival must be confirmed with Approach (APP) and Area (ACC) to ensure proper sequencing and spacing.

Aerodrome Procedures

Delivery (DEL)

Ground (GND)

Tower (TWR)

IFR Procedures
VFR Procedures

Approach Procedures (APP)

Area Control Procedures (ACC)

Managing Holding and Spacing During a Runway Change

Summary of Key Runway Change Steps

  1. Runway change is initiated by the Tower controller based on weather and operational factors.
  2. Tower coordinates with APP and ACC to determine the last departure and last arrival
  3. Delivery reclears affected departures and issues new runway clearances.
  4. Ground ensures proper taxi sequencing, holding aircraft as needed.
  5. Tower coordinates with Approach and obtains release for the first new departure.
  6. Approach vectors and sequences arrivals for the new runway while monitoring departure status.
  7. ACC clears aircraft for the appropriate STAR and coordinates with APP.
  8. APP informs ACC when the runway change is complete to resume normal operations.

Additional Best Practices for Runway Changes


Revision #14
Created 25 January 2025 02:19:12 by Ali
Updated 16 March 2025 17:13:03 by Ali